ONGOING PROJECTS
|
Sl. No. |
Name of Project |
|---|---|
|
1. |
4- Laning of Mohari to Satai Ghat section NH-934 from Km 50+300 to Km 89+875 (Total length 39.575 km) (Package-2) |
|
2. |
Construction /Up gradation 2 lane with paved shoulder from Design Km 95.55 (Bandarkoot) to Km. 111.06 (Chattroo) of 15.52 Km length on Khellani – Kishtwar – Chattroo section on NH-244 in the Union Territory of Jammu & Kashmir on EPC mode (Pkg –V). (Total LOA amount INR 202.60 Crores. SGIHPL share 51%, however, the work share of other member has also been carried out by SGIHPL) |
|
3. |
Rehabilitation & Upgradation to 2 Lane with Paved Shoulder from existing Chainage to Km 134.950 to Km 166.100 Design Chainage km 116.980 to146.700) (PKG-VI) under 31BRTF on Akhnoor-Poonch (NH-144A) in the UT of Jammu & Kashmir under project Sampark through Engineering, Procurement and construction (EPC) |
|
4. |
Widening and Strengthening - Upgradation to two Lane with Paved Shoulder from Existing Chainage Km 192+980 To Km 229+820 (Design Chainage Km 162.800 to Km 198.180) Under 31TF on Akhnoor - Poonch Road (NH-144A) in the Jammu & Kashmir under Project Sampark, Border Roads Organization (BRO) (Package- VIII). |
|
5. |
Improvement of Road Budhal-Mohore-Gul form Km 0.00 to Km22.720 (Net Length 21.000 km) PKG-I to NHDL specification under project Sampark in UT of J&K on EPC mode. |
|
6. |
Improvement of Road Budhal-Mohore-Gul form Km 22.720 to Km 62.940 (Net Length 29.080 km) PKG-II to NHDL specification under project Sampark in UT of J&K on EPC mode. |
|
7. |
Construction of Diaphragm wall (546.50 Mtr.) Downstream of Hathnikund Barrage |
|
8. |
Construction of bypass around Giridih town of NH-114A to 2 lane with paved shoulder from Km 0+000 to km 23+835 (Design chainage) in the State of Jharkhand under EPC Mode. SGIHPL share 10 % in Contract. |
|
9. |
Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga highway in the state of Bihar on EPC Mode. |
|
10. |
Construction and upgradation of existing 2 Lane to 4 Lane dual carriageway NH standard from Pandaach to Manigam section of NH1 as part of Srinagar Ring Road Phase – IIA on Engineering, Procurement and Construction (EPC) mode under NH (O) in the Union Territory of Jammu and Kashmir Project. |
|
11. |
Development of Keshod Airport. SH: Extension and Strengthening of Runway 05/23 and Construction of Link Taxiway, PTT, Apron, Isolation Bay, Perimeter Road, Operational Boundary Wall, Drainage System, etc., including allied works of Civil & Electrical at Keshod Airport |
|
12. |
Construction / Improvement of road Ditte Dimme- Migging from existing CL-9 to NHDL specifications from Km 0.00 to Km 29.936 (Design) (Existing Km 0.00 to Km 31.00 under 105 RCC/761 BRTF/Project Brahmank in the state of Arunachal Pradesh on EPC Mode (PKG-I). |
|
13. |
Long-term Rectification of MoRTH identified Blackspots by 1). Construction of LVUP at Km.370+780 at Koudiyal Cross [KA-(02)-069], (2). Construction of FOB atKm.372+200 at Engg College [KA-(04)-192], (3). Construction of LVUP at Km.390+728at Ram & Raj College [KA-(02)-515], (4). Construction of VUP at Km.415+380 at Manna-E-Khelli Entrance [KA-(03)-234], (5). Construction of LVUP at Km.455+586 at Digwal Village [TG-(02)-107] and (6). Construction of LVUP at Km.473+873 at Aroor Village [TG-(02)-016] under the project: Maharashtra/Karnataka Border – Sangareddy section of NH-65 (Old NH-9) from Km.352.188 to Km.497.174 in the state of Karnataka and Telangana on EPC mode. |
|
14. |
CONSTRUCTION OF ROAD KIBITHU KUNDAO FROM KM 0.000 TO KM 52.000 DESIGN LENGTH 0.000 TO 19.557 KMS GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN ANJAW DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE |
|
15. |
Construction of Major Bridge on Urmila Sagar Dam Project at KM. 171.800 On Karauli Dholpur Section of NH 11B in the State of Rajasthan on EPC Mode |
|
16. |
Road reconstruction & Slope protection work at 39.50 km near Mahanadi and Valley side restoration work at 37.00 km near Daragaon Devi Mandir of NH-55(New NH-110) during the FY 2025-26 under NHIDCL on EPC Mode in the state of West Bengal. |
|
17. |
Construction of Permanent Campus of JNV at Pakke Kessang, Arunachal Pradesh on EPC Mode-II Basis. |
|
18. |
Construction of 2L+PS Configuration Gangapur City Bypass on NH-23 under Annual Plan 2024-25 on EPC mode in the State of Rajasthan. |
|
19. |
Construction of elevated structure in Kherwara town in Udaipur district in the state of Rajasthan on EPC Mode. |